摘要
从地形、地质、施工、建筑材料、运行管理及投资等方面,对初选混凝土重力坝和拦河闸枢纽两种坝型进行了比较,提出高红水库宜采用拦河闸枢纽方案。
According to the conditions in aspects of the landform, geology, construction, building material, operational guidance, and investment, etc., this paper compares two types of dams of concrete gravity dam and sluice hinge, and recommends that the scheme of sluice hinge should be adopted in Gaohong Reservoir.
出处
《科技情报开发与经济》
2008年第26期219-220,共2页
Sci-Tech Information Development & Economy