对某电厂烟气脱硫工程所配顶进式搅拌器运行中出现的问题进行了分析,并提出对应的改进方案。
The problems existed in the operation of top - entering agitator in FGD system in the thermal power plant were analyzed. Some improvement measures were put forward.
出处
《电力环境保护》
2008年第5期38-39,共2页
Electric Power Environmental Protection