城市污水处理厂Orbal氧化沟的调试和运行 被引量:6

Commissioning and Operation of Orbal Oxidation Ditch in Municipal Wastewater Treatment Plant
下载PDF
导出
摘要 以西南某污水处理厂的Orbal氧化沟为例,采用接种培养和间歇培养相结合的方法进行调试,结果表明该方法可行。运行中控制厌氧池DO≤0.2mg/L,外沟DO〈0.5mg/L,中沟DO为0.5—1.5mg/L,内沟DO为2.0~3.0mg/L,污泥回流比为100%,MLSS为3500~4000mg/L,可以取得较好的处理效果。此外,还对运行中存在的问题进行了分析。 Taking the Orbal oxidation ditch in a wastewater treatment plant in Southwest China as an example, the commissioning was performed by combined method of seeding and intermittent culture. The results show that the combined method is feasible. Good treatment efficiency can be obtained when DO in the anaerobic tank is less than or equal to 0.2 mg/L, DO in the outer oxidation ditch is less than 0.5 mg/L, DO in the mid oxidation ditch is 0.5 to 1.5 mg/L, DO of the inner oxidation ditch is 2, 0 to 3.0 mg/L, sludge return ratio is 100% , and MLSS is 3 500 to 4 000 mg/L. Moreover, the problems existing in operation are analyzed.
作者 葛强
出处 《中国给水排水》 CAS CSCD 北大核心 2008年第20期96-99,共4页 China Water & Wastewater
关键词 ORBAL氧化沟 调试 运行 Orbal oxidation ditch commissioning operation
  • 相关文献

参考文献5

二级参考文献3

  • 1MATSUO Y,MIYA A,WATANABE A.Experimental studies on the anaerobic reaction of the activated sludge by the anaerobic aerobic process[J].J.Jap.Sewage Wks Ass.,1984,21(241):11-22.
  • 2FUKASE T,SHIBATA M,MIYAGI Y.Studies on the mechanism of biological removal of phosphorus[J].Jap.J.Wat.Pollut.Res.,1982,5:309-317.
  • 3BARNARD J L.Cut P and N without chemicals[J].Wat.Wastes Eng.,1974,11(7):33-48.

共引文献43

同被引文献38

引证文献6

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部