泥水平衡长距离顶管施工技术要点 被引量:7

Technical Measures of Long-distance Pipe-jacking Construction with Mud and Water Balance
下载PDF
导出
摘要 结合沧州市迎宾大道污水管道工程,介绍了长距离泥水平衡顶管施工的技术要点,包括合理确定顶力的方法、注浆减阻措施、确保止水圈可靠工作的方法、测量纠偏措施等,从而为相关工程的施工提供借鉴。 Combining with the sewage Conduit engineering of Yingbin Avenue in Cangzhou City, the technical measures of long-distance pipe-jacking construction with mud and water balance are introduced. The technical measures include the reasonable determination of jacking force, reducing the jacking resistance by injecting slurry, ensuring the reliable work of sealing collars and correcting the error of survey, thereby, which provides a reference for the construction of relevant engineering.
出处 《中国给水排水》 CAS CSCD 北大核心 2008年第20期100-103,共4页 China Water & Wastewater
关键词 长距离 泥水平衡顶管 顶力修正 注浆润滑减阻 long distance pipe-jacking with mud and water balance correction of jacking force reduction of jacking resistance by injecting slurry
  • 相关文献

参考文献2

  • 1GB50268-97.给水排水管道工程施工及验收规范[S].[S].,..
  • 2余彬泉 陈传灿.顶管施工技术[M].北京:人民交通出版社,2003..

共引文献119

同被引文献32

引证文献7

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部