摘要
以大唐阳城电厂二期7号空冷塔上部结构施工为例,通过对施工使用机械和模板工程工艺、混凝土浇筑方法等施工过程的优化,加快了施工进度,保证了空冷塔的内在质量和外观质量,同时也降低了施工的成本。
Takes Datang Yangeheng second stage project No. 7 air cooling tower superstructure construction for example. The optimization of machine and mold craftwork selection, concrete pouring, and construction quickness confirm both inner and outer quality of air-cooling tower, and also decrease the cost of construction.
出处
《山西电力》
2008年第5期21-23,共3页
Shanxi Electric Power
关键词
大型空冷塔
X支柱施工
筒壁施工
质量控制
large air-cooling tower
construction of x-column
construction of the thick tube-shaped
quality control