摘要
简要介绍刘山二线船闸的闸址选择方案比选,总平面、输水系统、主体结构等方面的设计特点和施工排水措施。
t briefly introduces the comparison and selection of lock site scheme for Liushan Twin Lock, the design characteristics of overall layout, water filling & emptying system and main structure, etc., as well as the construction drainage measures.
出处
《水运工程》
北大核心
1997年第12期25-29,共5页
Port & Waterway Engineering