摘要
介绍连云港深水外航道改扩建工程的实施情况,总结建设中的经验。
Implementation of the extension project of Lianyungang deepwater outer navigation channel is mainly introduced, the construction experience is summarized, and some new views on the causes of siltation after change of line of the outer navigation channel are advanced.
出处
《水运工程》
北大核心
1997年第8期37-40,共4页
Port & Waterway Engineering