注浆技术在柠条塔煤矿胶运大巷堵水工程中的应用 被引量:3

Application of grouting for water blocking in roadway belt conveyor haulage system in Ningtiaota mine
下载PDF
导出
摘要 柠条塔矿在3-1煤胶运大巷掘进中因发生涌水而终止掘进。通过对充水条件及特征的调查、分析及判断,得出该巷道涌水是因3-1煤层裂隙导水所致。采取对巷道两侧超前帷幕长孔渗透注浆和工作面短孔补充注浆相结合的方法,有效地控制了煤层段的涌水,使井巷掘进顺利穿越了约400 m长的3-1煤层,并完成了全部的支护工作。 Water inrush problem occurred during the excavation of roadway for No. 3^-1 coal-seam belt conveyor haulage system in Ningtiaota mine, which made excavation process ceased. Based on the analysis of water-bursting characters and water-bearing characteristics, it's sure that water inrush was induced by the fracture in No. 3^-1 coal-seam. The authors used full-face curtain permeation pre-grouting and reinforcing grouting in short holes on the mining faces to control water inrush problems. The results show that the combined method is effective and can ensure excavation process continue to 400 m long along No.3^-1 coal-seam and complete all roadway support work.
作者 周新莉
出处 《煤田地质与勘探》 CAS CSCD 北大核心 2008年第5期34-37,共4页 Coal Geology & Exploration
基金 "十一五"国家科技支撑计划重点项目(2007BAK24B05)
关键词 胶运大巷 煤层裂隙 涌水 注浆堵水 roadway for belt conveyor haulage system fracture in coal-seam water inrush grouting for water blocking
  • 相关文献

参考文献5

  • 1邝涧政.岩土注浆理论与工程实例[M].北京:科学出版社,2001:186-187.
  • 2陕西煤田185地质队.柠条塔煤矿井筒检查孔地质报告[R].2006.
  • 3梁炯望.锚固与注浆技术手册[M].北京:中国电力出版社,1999..
  • 4关文章.注浆工程技术规范[M].西安:西安交通大学出版社,1993.
  • 5石智军.煤矿坑道近水平孔钻探机具与定向钻进技术[C]//现代煤炭科学技术理论与实践.北京:煤炭工业出版社,2007:57-62.

共引文献27

同被引文献17

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部