摘要
对我国大亚湾及秦山核电厂的堆芯燃料管理策略的改进进行了初步探讨。对从传统三批年换料改进为四批年换料和延长循环长度(14~18个月)的可能性,以及可能取得的平均卸料燃耗增益进行了初步测算。研究表明,采用“增大循环燃耗”的先进燃料管理策略将带来重大的经济效益,是一项迫切需要研究的课题。
his paper presents a preliminary study on improving InCore fuel management strategy in Daya Bay Nuclear Power Plant(GNPS)and Qinshan Nuclear Power Plant(QNP).The feasibility of changing the reloading pattern from conventional 3 batches loading pattern(LP) to 4 LP and extending the cycle length to 14~18 months is evaluated.The possible benefit of average discharged burnup is calculated as well.The study shows that if the advanced fuel management strategy is employed,a remarkable efficiency in economics will be obtained.And it is an extremely urgent task to research advanced fuel management strategy for nuclear power plant in China.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
1997年第6期489-495,共7页
Nuclear Power Engineering
关键词
核电厂
压水堆
燃料管理
堆心燃料
管理策略
uclear power plant Pressurised water reactor Fuel managementStrategy