期刊文献+

秦山和大亚湾核电厂堆芯燃料管理策略改进的初步探讨 被引量:1

Preliminary Study on Improving InCoreFuel Management Strategy ofGNPS and QNP
下载PDF
导出
摘要 对我国大亚湾及秦山核电厂的堆芯燃料管理策略的改进进行了初步探讨。对从传统三批年换料改进为四批年换料和延长循环长度(14~18个月)的可能性,以及可能取得的平均卸料燃耗增益进行了初步测算。研究表明,采用“增大循环燃耗”的先进燃料管理策略将带来重大的经济效益,是一项迫切需要研究的课题。  his paper presents a preliminary study on improving InCore fuel management strategy in Daya Bay Nuclear Power Plant(GNPS)and Qinshan Nuclear Power Plant(QNP).The feasibility of changing the reloading pattern from conventional 3 batches loading pattern(LP) to 4 LP and extending the cycle length to 14~18 months is evaluated.The possible benefit of average discharged burnup is calculated as well.The study shows that if the advanced fuel management strategy is employed,a remarkable efficiency in economics will be obtained.And it is an extremely urgent task to research advanced fuel management strategy for nuclear power plant in China.  
机构地区 西安交通大学
出处 《核动力工程》 EI CAS CSCD 北大核心 1997年第6期489-495,共7页 Nuclear Power Engineering
关键词 核电厂 压水堆 燃料管理 堆心燃料 管理策略 uclear power plant Pressurised water reactor Fuel managementStrategy
  • 相关文献

同被引文献4

  • 1Fu Z A,Privatecommunication,1999年
  • 2Cheng Pingdong,Proc.Int.Conf.on Phys of Nucl.Sci. &Tech.Vol.1,1998年,223页
  • 3程平东,核电工程与技术,1988年,8卷,3期,1页
  • 4谢仲生,PeterBoczar.CANDU堆先进燃料循环的展望[J].核动力工程,1999,20(6):560-565. 被引量:13

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部