沉井施工降水时地下水的动态分析 被引量:7

Dynamic Analysis on Groundwater during Precipitation of Construction for Open Caission
下载PDF
导出
摘要 以泰州长江大桥北锚碇(沉井)周边为研究区,根据地质资料、边界条件和各源汇项,采用网格法与概念模型联合建模的思想,用地下水模拟软件GMS对研究区地下水水流进行数值模拟,预测了北锚碇施工期的涌水量和地下水位的动态变化,计算结果与工程实际相吻合。 Taking the north anchorage (caisson) and its surrounding area of Taizhou Yangtse Rive Bridge as the study area, the model is built according to the geologic data, border conditions and various source-sink items and combining the grid approach with conceptual model approach, and the groundwater simulation software GMS is used to simulate the groundwater flow in the area, and predict the discharge and the trend of groundwater level in the construction period. The result tallies with the actual project.
出处 《水利与建筑工程学报》 2008年第4期54-57,共4页 Journal of Water Resources and Architectural Engineering
关键词 沉井 施工降水 地下水数值模拟 GMS open caisson precipitation of construction numerical simulation of groundwater GMS
  • 相关文献

参考文献3

二级参考文献7

共引文献272

同被引文献59

引证文献7

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部