摘要
以泰州长江大桥北锚碇(沉井)周边为研究区,根据地质资料、边界条件和各源汇项,采用网格法与概念模型联合建模的思想,用地下水模拟软件GMS对研究区地下水水流进行数值模拟,预测了北锚碇施工期的涌水量和地下水位的动态变化,计算结果与工程实际相吻合。
Taking the north anchorage (caisson) and its surrounding area of Taizhou Yangtse Rive Bridge as the study area, the model is built according to the geologic data, border conditions and various source-sink items and combining the grid approach with conceptual model approach, and the groundwater simulation software GMS is used to simulate the groundwater flow in the area, and predict the discharge and the trend of groundwater level in the construction period. The result tallies with the actual project.
出处
《水利与建筑工程学报》
2008年第4期54-57,共4页
Journal of Water Resources and Architectural Engineering
关键词
沉井
施工降水
地下水数值模拟
GMS
open caisson
precipitation of construction
numerical simulation of groundwater
GMS