软土地基嵌入卵石层钻孔灌注桩后压浆技术问题研究 被引量:1

Some problems about post-grouting design of bored pile inserted to boulder bed in soft foundation
原文传递
导出
摘要 结合实际工程,对嵌入卵石层钻孔灌注桩后压浆设计、施工中后压浆方法的选择、注浆量的确定、后压浆桩的承载力计算、后压浆在超长桩中的应用等进行了研究。试验结果表明,采用后压浆时应选用桩底注浆,桩底后压浆的注浆量与桩径的平方成正比;后压浆桩端承载力可按预制桩的桩端承载力进行计算;后压浆对超长桩的承载力和沉降均有较大改善。 Based on actual projects, it carries out research on the choice of post-grouting method, grouting quantity and bearing capacity of bored pile, and the application of post-grouting in super-long pile. The experiments show that grouting under the bottom of the pile is preferred when using post-grouting, and the grouting quantity is in direct proportion to square of the diameter of the pile. The carrying capacity of the bottom of the post-grouting can be calculated according to the carrying capacity of the bottom of the prefab pile, and post-grouting can greatly improve the carrying capacity and settlement of the super-long pile.
出处 《建筑结构》 CSCD 北大核心 2008年第10期106-108,共3页 Building Structure
关键词 卵石层 钻孔灌注桩 后压浆 注浆量 超长桩 boulder bed bored pile post-grouting grouting quantity super-long pile
  • 相关文献

参考文献7

二级参考文献26

共引文献206

同被引文献2

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部