摘要
小浪底地下厂房吊车梁,采用岩壁吊车梁型式.预应力锚杆采用双层保护后张法.在岩壁吊车梁施工中,质量高、进度快,集预裂爆破、光面爆破、深孔梯段爆破、预应力锚杆的制作与安装等新工艺技术为一体,取得了较好的技术经济效果.
In Xiaolangdi Hydropower Station,the underground workshop crane beam adopts rocky crane beam model,the prestressed anchor bar adopts the doublelayer protective posttensioning method.In the construction of rocky crane beam,the new technology of presplit,reface,deepgradient bursts and manufacture and mounting of prestressed anchor bar with high quality and rapid progress are applied.
出处
《洛阳大学学报》
1997年第4期50-52,77,共4页
Journal of Luoyang University
关键词
地下厂房
岩壁
吊车梁
水电站
施工
underground workshop,rocky crane beam,excavation,burst,backward prestressed anchor bar