摘要
调速器空载位置计算的准确与否,对提高机组的并网速度,缩短开机时间,提高水资源的有效利用,特别是水资源相应缺乏的北方地区尤为重要。
Governor empty the calculation of the exact location or not, and to improve the unit's network speed, shorten the boot time and increase the efficient use of water resources, especially water resources corresponding lack of the northern region is particularly important.
出处
《水利科技与经济》
2008年第10期842-843,共2页
Water Conservancy Science and Technology and Economy
关键词
空载开度
区间法
水头
跟踪法
回归曲线法
noload opening
interval method
water head
tracking method
return curve method