摘要
介绍了张峰水库大坝黏土填筑过程中从料场开采、土料填筑到检测试验质量控制的具体措施及方法,并且在施工中取得了良好的效果。
The paper introduces the concrete measures and methods of excavating clay from borrow area,placing and compacting clay,detection test and controlling quality in the whole process to place the core wall.Because of adopting these measures and methods,the good effect has obtained.
出处
《山西水利科技》
2008年第4期35-36,共2页
Shanxi Hydrotechnics
关键词
黏土
施工
质量控制
试验
clay construction quality control test