期刊文献+

FINITE ELEMENT NUMERICAL SIMULATION OF THREE-DIMENSIONAL SEEPAGE CONTROL FOR DEEP FOUNDATION PIT DEWATERING 被引量:41

FINITE ELEMENT NUMERICAL SIMULATION OF THREE-DIMENSIONAL SEEPAGE CONTROL FOR DEEP FOUNDATION PIT DEWATERING
原文传递
导出
摘要 For deep foundation pit dewatering in the Yangtze River Delta, it is easy to make a dramatic decrease of the underground water level surrounding the dewatering area and cause land subsidence and geologic disasters. In this work, a three-dimensional finite element simulation method was applied in the forth subway of Dongjiadu tunnel repair foundation pit dewatering in Shanghai. In order to control the decrease of the underground water level around the foundation pit, the foundation pit dewatering method was used to design the optimization project of dewatering ,which was simulated under these conditions that the aquifers deposited layer by layer, the bottom of the aquifers went deep to 144.45 m, the retaining wall of foundation pit shield went deep to 65 m, the filters of the extraction wells were located between 44 m to 59 m, the water level in the deep foundation pit was decreased by 34 m, and the maximum decrease of water level outside the foundation pit was 3 m. It is shown that the optimization project and the practical case are consistent with each other. Accordingly, the three-dimensional finite element numerical simulation is the basic theory of optimization design of engineering structures of dewatering in deep foundation pit in such areas. For deep foundation pit dewatering in the Yangtze River Delta, it is easy to make a dramatic decrease of the underground water level surrounding the dewatering area and cause land subsidence and geologic disasters. In this work, a three-dimensional finite element simulation method was applied in the forth subway of Dongjiadu tunnel repair foundation pit dewatering in Shanghai. In order to control the decrease of the underground water level around the foundation pit, the foundation pit dewatering method was used to design the optimization project of dewatering ,which was simulated under these conditions that the aquifers deposited layer by layer, the bottom of the aquifers went deep to 144.45 m, the retaining wall of foundation pit shield went deep to 65 m, the filters of the extraction wells were located between 44 m to 59 m, the water level in the deep foundation pit was decreased by 34 m, and the maximum decrease of water level outside the foundation pit was 3 m. It is shown that the optimization project and the practical case are consistent with each other. Accordingly, the three-dimensional finite element numerical simulation is the basic theory of optimization design of engineering structures of dewatering in deep foundation pit in such areas.
出处 《Journal of Hydrodynamics》 SCIE EI CSCD 2008年第5期596-602,共7页 水动力学研究与进展B辑(英文版)
基金 the Major Scientific Research Project Foundation of Shanghai (Grant No. 04dz12003)
关键词 Yangtze River Delta land subsidence deep foundation pit dewatering seepage control Yangtze River Delta, land subsidence, deep foundation pit dewatering, seepage control