摘要
对三峡电厂连接发电机断路器(GCB)主变进行冲击合闸过程中,出现的GCB外壳对支架异常放电现象进行了分析研究,并提出了改进方案。
This article analyzed and studied the GCB(generator circuit- breaker) abnormal crust discharge phenomena, from its casing to support, during the course of surge closing of Three Gorges power plant transformers connected with GCB, and put forward the improvement scheme.
出处
《湖北电力》
2008年第5期26-27,43,共3页
Hubei Electric Power