摘要
详细分析了在顶管施工过程中引起地面变形的原因,建立了应用明德林解计算顶管施工中顶推力以及摩擦力引起的地面变形的计算模型,并探讨了模型中相关参数取值的确定方法.运用建立的模型对一个具体的顶管施工问题进行了应用研究,结果表明,所得结论符合工程实际.
This article analyses the reasons of ground deformation in the pipe jacking engineering, based on Mindlin's solution, establishes the calculation model of ground deformation caused by jacking force and friction, and discusses the method how to select the parameters in the calculation model. The established model, are applied in a pipe jacking engineering, and the result indicates that the conclusion accord with the fact.
出处
《河南科学》
2008年第11期1383-1387,共5页
Henan Science
基金
河南省高校创新人才培养计划项目(2005)
河南省科技攻关项目(082102360025)
关键词
顶管施工
地面变形
明德林解
pipe jacking
ground deformation
Mindlin's solution