内加强月牙肋钢岔管水压试验 被引量:8

Water pressure test of crescent-rib reinforced bifurcated pipe
下载PDF
导出
摘要 结合某高水头电站埋藏式月牙肋钢岔管的工程实际,采用有限元方法对岔管水压试验方案进行了分析研究,并与传统的简化算法进行了比较,讨论了结构自重、水重、支座作用等因素对岔管结构应力应变分布规律的影响.根据钢岔管与支座顶部翼缘的连接条件,分固结和摩擦接触两种情况进行了比较,给出了水压试验时岔管及支座结构的应力状态和变形情况,并对结构的整体安全性做出了评价. Through an illustration of a crescent rib reinforced bifurcated pipe of an underground hydropower station, the finite element method is used to study its hydraulic pressure test; the results are compared with ones by traditional simplified method. The influences of structure weight, water weight and supporting factors on the distribution of stress and strain of the bifurcated pipe are discussed. According to the connecting conditions of the steel bifurcated pipe and the top flange of bearing, the stress and de- formation of the bifurcated pipe and bearing under weld case and friction case in the water pressure test are given and compared; finally, an overall safety evaluation of the structure is put forward.
出处 《武汉大学学报(工学版)》 CAS CSCD 北大核心 2008年第5期35-39,共5页 Engineering Journal of Wuhan University
关键词 月牙肋岔管 水压试验 支座 固结 接触 crescent-rib reinforced bifurcated pipe water pressure test supporting weld contact
  • 相关文献

参考文献8

二级参考文献8

  • 1SD144-85.水电站压力钢管设计规范(试行)[S].[S].,..
  • 2DL/15141-2001.水电站压力钢管设计规范[S].[S].,..
  • 3王志国.内加强月牙肋岔管技术研究专题研究报告[R].国家电力2001年科技项目.北京:北京勘测设计研究院,2004年12月.
  • 4野口建夫 等 刘更新译.奥美浓抽水蓄能电站内加强月牙肋岔管考虑围岩分担内水压力设计[J].电力土木,1996.
  • 5刘宪亮.内加强月牙岔管体型优化及自动化绘图研究报告[R].郑州:黄河水利职业技术学院,2004年11月.
  • 6钟秉章,陆强.西龙池抽水蓄能水电站内加强月牙肋岔管三维有限元分析研究报告[R].杭州:浙江大学固体力学研究所,2003年10月.
  • 7段云岭,张义.西龙池抽水蓄能水电站钢岔管现场结构模型试验报告[R].北京:清华大学土木水利工程学院.2005年1月.
  • 8王志国.高水头大PD值内加强月牙肋岔管布置与设计[J].水力发电,2001,27(10):56-58. 被引量:25

共引文献27

同被引文献50

引证文献8

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部