宁波大榭招商国际集装箱码头工程在地质条件复杂、使用要求高、施工周期短等条件下,通过合理的平面布置及选择合适的水工结构型式,尤其采用70~76 m的超长组合管桩代替钢管桩以及全直桩嵌岩桩方案等技术措施,确保了工程质量和安全,加快了施工进度,实施效果良好。
During design of Daxie Merchants Steam Navigation International Container Terminal Project which was characterized 1 by complicated geologic condition, high service requriement and tight construction period, due to the adoption of rational layout and proper marine structural pattern, esp. the application of the technical measures such as substituting the steel pipe piles with 70-76 m ultra-long composite pipe piles,straight piles and rock-encased piles, we ensured the construction quality and safety, and speeded UP the construction progress. The implementation effect was quite satisfactory.
出处
《水运工程》
北大核心
2008年第10期113-119,共7页
Port & Waterway Engineering
关键词
组合管桩
钢管桩
嵌岩桩
桩型选择
composite pipe pile
steel pipe pile
rock encased pile
selection of pile type