摘要
根据工程量清单计价模式下施工项目成本控制的重点,提出优化施工方案,合理控制人工、材料、机械费用,加强现场管理,加强对临时设施的管理以及加强合同、变更、索赔的管理等成本控制措施。
According to the key of project cost control under bill of quantity, puts forward some cost control measures, such as optimizing the construction scheme; controlling the expense of labor, material and reasonably; strengthening the site management, temporary, facility management and the management of contract, change and claim.
出处
《建筑经济》
北大核心
2008年第11期116-118,共3页
Construction Economy
关键词
工程量清单
成本控制
优化
bill of quantity
cost control
optimize