一种新的资源水平问题模型及求解方法

A New Model of Resource Leveling Problem and Its Solution Method
下载PDF
导出
摘要 资源水平问题是工程调度问题的一个重要分类,在单件或小批量生产方式企业中有着广泛的应用.提出了一种新的资源水平问题的模型,该模型对目标函数较以往模型作了更详细的讨论,并给出相应的求解方法——分支定界算法.实例分析表明,提出的资源水平问题应在资源使用趋于平稳的情况下尽量延迟活动的开始时间. As an important branch of project scheduling problem,resource leveling problem( RLP) has extensive applications in the single piece or the small batch quantity mode of production for the business enterprise. This paper proposes a new model of RLP,which object function is more detailed than before. Then we give a solution-branch-and-bound(BAB)algorithm for the model. By computational study of some project instances, we show that the start time of activities should be delayed as late as possible with balanced use of the resource for the model similar to ours.
作者 姜晓威
出处 《北华大学学报(自然科学版)》 CAS 2008年第5期408-412,共5页 Journal of Beihua University(Natural Science)
关键词 资源水平 AON网络 资源约束 分支定界 Resource leveling Activity-on-node network Resource constrained BAB
  • 相关文献

参考文献12

  • 1[1]Eaeasa S.Resource Leveling in Construction by Optimization[J].Journal of Construction Engineering and Management,1989,115(2):302-316.
  • 2[2]Neumann R,Zimmermann J.Resource Leveling for Projects with Schedule Dependent Time Windows[J].European Journal of Operational Research,1999,117(3):591-605.
  • 3[3]Neumann R,Zimmermann J.Procedures for Resource Leveling and Net Present Value Problems in Project Scheduling with General Temporal and Resource Constraints[J].European Journal of Operational Research,2000,127(2):425-443.
  • 4[4]Odile B,Emmanuel N.A Branch-and-Bound Method for Solving Multi-Skill Project Scheduling Problem[J].Operations Research,2007,41:155-170.
  • 5[5]Bell C,Han J.A New Heuristic Solution Method in Resource Constrained Project Scheduling[J].Naval Research Logistics,1991,38(3):315-331.
  • 6[6]Fleszar K,Hindi K.Solving the Resource-Constrained Project Scheduling Problem by a Variable Neighbourhood Search[J].European Journal of Operational Research,2004,155(2):402-413.
  • 7[7]Marek M,Grzegorz W,Jan W.Simulated Annealing and Tabu Search for Multi-Mode Resource-Constrained Project Scheduling with Positive Discounted Cash Flows and Different Payment Models[J].European Journal of Operational Research,2005,164:639-668.
  • 8[8]Najafi A,Niaki S.Genetic Algorithm for Resource Investment Problem with Discounted Cash Flows[J].Applied Mathematics and Computation,2006,183(2):1057-1070.
  • 9[9]Demeulemeester E.Minimizing Resource Ability Costs in Time-Limited Project Networks[J].Management Science,1995,41(10):1590-1598.
  • 10[10]Kolisch R.Serial and Parallel Resource Constrained Project Scheduling Methods Revisited Theory and Computation[J].European Journal of Operational Research,1996,90(2):320-333.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部