摘要
根据工程设计的要求,以填料塔设计通用关联图为基础,采用正交筛选法进行数据处理,将图表回归成压降和泛点的简单关联式。并对图中近400组数据点与关联式的计算值作了对照检验。
The correlations for estimating pressure drop and flood point in packed tower are given by means of Orthognal Sieve method, based on the general design chart for a packed tower, in consideration of the requirement of the engieering design.The eximinations for about 400 data points between the results given by the chart and the calculated results are made comparatively.
出处
《化学工程》
CAS
CSCD
北大核心
1990年第3期41-43,共3页
Chemical Engineering(China)