曲阜孔子文化会展中心展厅钢结构安装施工技术 被引量:3

ERECTION TECHNIQUE OF STEEL STRUCTURES FOR HALLS OF QUFU CONFUCIAN CULTURAL CONVENTION AND EXHIBITION CENTER
下载PDF
导出
摘要 介绍曲阜孔子文化会展中心展厅钢结构工程安装施工技术。作为三角管桁架结构,两个展厅用钢量共8000多吨,所有桁架都需在施工现场拼装焊接,且土建、幕墙等各专业之间施工安排交叉严重,现场协调、配合难,安全隐患多。经过精心组织、方案优化,最终只用66d就完成了现场拼装、安装工作,是钢结构安装施工的一个典型工程。 It is presented the erection technique of steel structures for halls of Qufu Confucian Cultural Convention and Exhibition Center. As a triangular pipe truss, the steel dosage for two exhibition halls is more than 8 000 t, and all the trusses need assembly and welding at worksite. Therefore, it is very difficult for construction arrangement and site coordination among civil construction and other specialities. Site assembly and erection are finished within 66 d by careful organization and optimized scheme, which is a typical project of steel structure erection.
作者 王留成
出处 《钢结构》 2008年第10期56-59,55,共5页 Steel Construction
关键词 会展中心 管桁架结构 施工技术 整体吊装 convention and exhibition center pipetruss structure construction technique integral lifting
  • 相关文献

参考文献1

  • 1中国钢结构协会.建筑钢结构施工手册[M].北京:中国计划出版社,2002..

共引文献14

同被引文献8

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部