期刊文献+

三河尖矿建设高产高效矿井的主要做法 被引量:1

Main methods for constructing high production and high efficiency colliery in Sanhejian Coal Mine-
下载PDF
导出
摘要 介绍了三河尖矿针对矿井投产基础差、地质构造复杂、迁村量大等不利因素,在建设高产高效矿井方面所开展的合理生产布局、组织科技攻关、狠抓重点区队单产单进水平、深化内部改革等一系列工作,取得较好效果,连续保持了"部级双高矿井"称号。 -In order to realizing the high pro- duction and high efficiency colliery,the series work such as,rational mining layout,research projects,increasing coal production and tumeling speed,and deepening inside reform etc.are done in Sanhejian Coal Mine,although it has many unfavourable factors(bad production basis, complex of geological structure,and move of vil- lages to non-coal areas).The title of the high production and high efficiency colliery is kept sev- eral yerars in the Ministry of Coal Industry.
出处 《煤矿开采》 1997年第3期3-6,共4页 Coal Mining Technology
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部