摘要
常州市在2007年快速公交一号线建成运营后,又规划实施常州市快速公交二号线项目。在分析二号线项目改造工程整体情况的基础上,探讨了改造工程中道路横断面布置、路面结构处理、节点处理等具体问题。
The project of Line 2 of Bus Rapid Transit has planned to be put to execution in Changzhou after the operation of Line 1. Analyzing the overall condition of Line 2 rebuilding project, the paper discusses the problems, such as arrangement of cross section, structure process of road surface and joint treatment.
出处
《江苏理工学院学报》
2008年第2期91-96,共6页
Journal of Jiangsu University of Technology
关键词
BRT
道路
改造
Bus Rapid Transit
roadway
rebuild