介绍了郑煤集团公司复盛煤矿主井底巷道布置情况。通过主井装载硐室通道的3种设计方案比较,采取了最佳的设计方案,使矿井的安全效益、经济效益、施工工期得到充分兼顾,具有一定的借鉴价值。
The arrange circumstance of the main shaft bottom tunnel in Fusheng Coal Mine is introduced. Through comparing three kinds of design projects of the main shaft loading pocket passage, the best design project is adopted. The safe and economic effectiveness of the coal mine, and construction time limit for a project are balanced. The project has a reference value.
出处
《煤炭技术》
CAS
2008年第11期67-69,共3页
Coal Technology
关键词
主井
装载硐室
通道
main shaft
loading pocket
passage