期刊文献+

基于Markov链的集束型晶圆制造设备预防性维护建模 被引量:1

Preventive Maintenance Modeling of Cluster Tools for Fabrication Wafers Based on Markov Chain
下载PDF
导出
摘要 为了有效提高集束型晶圆制造设备的运行可靠性,同时降低其维护成本,提出了基于Markov链的预防性维护建模方法.根据集束型晶圆制造设备的特点,将设备使用情形分为运行状态、预防性保养状态、保养未能回复状态、预防性维修状态和维修无法回复状态,建立了设备状态转移模型.在此基础上,建立了集束型晶圆制造设备的预防性维护成本模型,进行了仿真实验分析.结果表明,该模型可有效分析不同参数组合下的单位时间预防性维护期望成本. To improve the running reliability of cluster tools for fabrication wafers, and to reduce maintenance cost efficiently, a Markov chain-based modeling method for preventive maintenance was proposed. According to the characteristics of the cluster tools, five states are defined, such as the running state, pre- ventive maintenance (PM) state, PM un-restore state, preventive repair (PR) state and PR un-restore state. A state transition model was built with the five states. On the basis of the proposed model, an expected preventive maintenance cost model was presented. Finally, the built model was tested with simulative experiment data. The results indicate that the Markov chain-based preventive maintenance model is valid for analyzing the expected maintenance cost rate per unit time according to different combinations of modeling parameters.
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2008年第10期1622-1626,共5页 Journal of Shanghai Jiaotong University
基金 国家自然科学基金资助项目(60574054 70671065) 上海市科委登山行动计划项目(06DZ11202)
关键词 集束型设备 晶圆 马尔可夫链 预防性维护 cluster tools wafer Markov chain preventive maintenance
  • 相关文献

参考文献8

  • 1Sze S M. Modern semiconductor device physies[M]. New York: John Wiley & Sons, Inc, 1998.
  • 2Pinjala S K, Pintelon L, Vereecke A. An empirical investigation on the relationship between business and maintenance strategies [J]. International Journal of Production Economies, 2006, 104(2): 214-229.
  • 3Chan G K, Asqarpoor S. Optimum maintenance policy with Markov processes[J]. Electric Power Systems Research, 2006, 76(6/7): 452-456.
  • 4Chen D, Kishor S T. Optimization for condition-based maintenance with semi-Markov decision process [J]. Reliability Engineering and System Safety, 2005, 90(1) :25-29.
  • 5Yeh R H. Optimal inspection and replacement policies for multi state deteriorating systems [J]. European Journal of Operational Research, 1997, 96 (2) : 248-259.
  • 6Chen A, Guo R S, Wu G S. Real-time equipment health evaluation and dynamic preventive maintenance [C]//IEEE International Symposium on Semiconductor Manufacturing Proceedings. Tokyo: IEEE, 2000:375 -378.
  • 7Yuan J, Chen C T. On a dynamic preventive maintenance policy for a system under inspection[J]. Reliability Engineering and System Safety, 2003, 80 ( 1 ) : 41- 47.
  • 8Chan G K, Asgarpoor S. Optimum maintenance policy with Markov processes[J]. Electric Power Systems Research, 2006, 76(4): 452-456.

同被引文献13

  • 1Yao X D, Ferndndez-Gaucherand E, Fu M C, et al. Optimal preventive maintenance scheduling in semi-- conductor manufacturing [J].. IEEE Transactions on Semiconductor Manufacturing, 2004, 17 (3) : 345- 356.
  • 2Yao X D, Fu M, Marcus S I, et al. Optimization of preventive maintenance scheduling for semiconductor manufactl stems: Models and implementation[C]// Proceedings of the 2001 IEEE International Conference on Control Applications. Mexico: IEEE, 2001: 407- 411.
  • 3Zhou X J, Xi L F, Lee J. Opportunistic preventive maintenance scheduling for a multi-unit series system Based on dynamic programming [J]. International Journal of Production Economics, 2009, 118(2) : 361- 366.
  • 4Bedford T, Dewan I, Meilijson I, et al. The signal model: A model ,or competing risks of opportunistic main*enance [J]. European Journal of Operational Re- search, 2011, 214(3) : 665-673.
  • 5Kooehaki J, Bokhorst J A C, Wortmann H, et al.Condition based maintenance in the context of oppor- tunistic maintenance [J]. International Journal of Production Research, 2012, 50(23) .. 6918 6929.
  • 6Yeh R H. Optimal inspection and replacement poli- cies for multi-state deteriorating systems[J].Europe- an Journal of Operational Research, 1997, 96 (2) : 248 259.
  • 7Tomasevicz C L, Asgarpoor S. Optimum mainte- nance policy using semi-Markov decision processes [J]. Electric Power Systems Research, 2009, 79(9): 1286-1291.
  • 8Chen D Y, Trivedi K S. Optimization for condition based maintenance with semi Markov decision process [J]. Reliability Engineering & System Safety, 2005, 90(1) : 25-29.
  • 9Huang C C, Yuan J. A two-stage preventive mainte- nance policy for a multi-state deterioration system [J]. Reliability Engineering & System Safety, 2010, 95(11) : 1255-1260.
  • 10Nodem F I D, Gharbi A, Kenne J P. Preventive ma- intenance and replacement policies for deteriorating production systems subject to imperfect repairs [J]. International Journal of Production Research, 2011, 49(12): 3543 3563.

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部