摘要
根据某铅冶炼厂进口设备的特点和存在问题,进行技术改造。阐述了S5—115U PLC在本系统中配置的特点,梯形图的设计思路和方法,最后介绍了应用结果。
According to the special feature and the existing problems of a lead smelter,the device reforming has been made,This paper describes the configuration of the system,the design method of the ladder diagram and the application results.
出处
《电气自动化》
北大核心
1997年第6期54-56,共3页
Electrical Automation