摘要
结合工程实际,从施工准备、钢绞线的力学性能、混凝土施工、施加预应力、孔道压浆等几个方面探讨后张法50m预应力T梁的施工控制方法,对同类工程的施工有一定的指导意义。
Combining with factual engineering, it discusses construction controlling methods of 50- meter prestressed concrete T beam with post-extensive method in aspects of implement preparation, mechanics character of steel stranded wire, concrete implement, exerting pressure, press grouting and so on, it has guiding value to similar engineerings.
出处
《交通标准化》
2008年第21期154-157,共4页
Communications Standardization
关键词
后张法
50M预应力
T梁
施工
post-extensive method
50-meter prestress
T beam
construction