期刊文献+

EPA无线工业控制系统的任务调度算法

Task scheduling algorithm of wireless industrial control system based on EPA
下载PDF
导出
摘要 针对基于EPA标准的工业控制系统底层使用无线通信技术时,传统的实时调度机制不适应无线工业应用的特点,很难达到原有的效果等问题。以解决无线工业控制系统通信任务的超时现象为目的,提出了适合无线EPA标准的任务调度算法。利用启发式机制搜索合理的通信任务预留时间,并根据预留时间进行功能任务和通信任务的联合调度。最后,分析了基于该方法的一个应用实例,该调度方法有效地延长了通信任务的截止时间,进而补偿了无线技术在工业恶劣环境中出现的信道传输质量极不稳定带来的实时性较差等负面影响。 The traditional real-time scheduling mechanism is unfit for characteristic of wireless industrial application. When the physical layer of industrial control system based on EPA makes use of wireless technology the performance of traditional scheduling mechanism faces serious degradations. For the purpose of solution overtime problem about communications task of wireless industrial control system, the scheduling algorithm according to wireless EPA profile is proposed in this paper. The reasonable remained time is found by heuristic mechanism. Function block task and communication task are scheduled together based on the remained time. Finally, an application based on the algorithm is analyzed. The proposed scheduling algorithm extended the deadline for the communications task, and compensated some adverse effect that instability of transmission quality resulted in declining on the real-time in execrable industrial environment.
出处 《辽宁工程技术大学学报(自然科学版)》 CAS 北大核心 2008年第5期738-741,共4页 Journal of Liaoning Technical University (Natural Science)
基金 国家“863”计划基金资助项目(2004AA412020)
关键词 任务调度 工业以太网 EPA 无线工业控制系统 task scheduling industrial Ethemet EPA wireless industrial control system
  • 相关文献

参考文献5

二级参考文献20

  • 1冯冬芹,金建祥,褚健.EPA实时以太网标准化[J].自动化博览,2004,21(4):29-31. 被引量:4
  • 2谢昊飞,梅海军,王平,王浩.基于EPA协议的蓝牙接入装置[J].计算机工程,2004,30(21):160-161. 被引量:1
  • 3吴爱国,郭昕.现场总线CAN与无线以太网IEEE802.11的结合[J].组合机床与自动化加工技术,2004(11):61-62. 被引量:4
  • 4Jia Xu, Multiprocessor Schedulong of Processes with Release Times, Deadlines, Precedence, and Exclusion Relations, IEEE Trans. on Software Eng. 1993,19(2):139~154
  • 5Tarek F. Abdelzaher and Kang G. Shin, Combined Task and Message Scheduling in Distributed Real-Time Systems, IEEE Trans. on Parallel and Distributed System, 1999,10(11):1179~1191
  • 6Eduarado Tovar, Supporting Real-Time Communications with Standard Factory-Floor Networks, Protugal: Polytechnic Institute of Porto, the dissertation for the degree of Doctor, July 1999
  • 7Yue Zhou, Zhi Wang, Hai B.Yu and Tian R.Wang, A new method to the FF schedule time list, IFAC Conference on NTCC2001, 539~543,19~22 November 2001
  • 8Claudio Aun Fayad, Process Control Performance on a Foundation Fieldbus System, ISA EXPO/2000,21~24 August, 2000
  • 9Zhi Wang,Yue Zhou,Youxian Sun,Tian-ran Wang,Response time of urgent aperiodc message in FF, IFAC ON NTCC2001, 527~532. 19~22 November 2001
  • 10Giorgio C.Buttazzo, Hard real-time computing systems predictable scheduling algorithm and application, KLUWER ACADEMIC PUBLISHERS, 1997

共引文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部