期刊文献+

悬臂浇筑施工中连续箱梁预应力管道摩阻测试 被引量:2

Pipeline hindering test of continual box beam prestressed in cantilever pouring construction
下载PDF
导出
摘要 通过应用最小二乘法原理,由规范中的公式推导预应力管道摩阻的计算公式,结合顺德大学特大桥悬臂浇筑施工连续箱梁预应力管道摩阻的现场测试,计算出实际预应力管道摩阻系数,并与设计值和规范值比较,表明管道成孔良好,符合设计要求。 According to use the principle of smallest second multiplication, from using standard formula to put out the calculative formula of prestressed pipeline hindering, combining with the local test of specially big bridge cantilever pouting construction continual box beam prestressed pipeline hindering in Shunde university, calculates practical prestressed pipeline hindering modulus, and compares with de.sign value and standard value, indicates that pipeline becoming hole is good and meet design demand.
机构地区 兰州交通大学
出处 《山西建筑》 2008年第32期26-27,共2页 Shanxi Architecture
关键词 管道摩阻 预应力 连续箱梁 悬臂浇筑 摩阻系数 pipeline hindering, prestressed, continual box beam, cantilever pouring, hindering modulu
  • 相关文献

参考文献4

二级参考文献11

  • 1长安大学.预应力混凝土连续弯箱梁桥的预应力孔道摩阻损失参数研究报告[M].西安:长安大学,2000..
  • 2长安大学,预应力混凝土连续弯箱梁桥的预应力孔道摩阻损失参数研究报告,2000年
  • 3JTJ0 23-85.公路钢筋混凝土及预应力混凝土桥涵设计规范,1998年
  • 4美国公路桥梁设计规范,1998年
  • 5孙广华,曲线梁桥计算,1995年
  • 6邵容光,混凝土弯梁桥,1994年
  • 7雷俊卿.桥梁悬臂施工与设计[M].人民交通出版社,1999..
  • 8TB10002.3—99,铁路桥涵钢箱混凝土和预应力混凝土结构没计规范[S].
  • 9陆右仁.公路施工手册-桥梁[M].北京:人民交通出版社,2000.175-180.
  • 10孙学先,刘风奎.预应力混凝土弯梁桥悬臂施工线型控制[J].工程力学,1999,3(a03):175-180. 被引量:2

共引文献227

同被引文献10

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部