摘要
通过工程实例,介绍了1 200 m2自然通风冷却塔的主要工程顺序和施工方案,及采取的质量保证措施,经实际施工验证,混凝土生产水平达到了优良,实现了建达标机组,创优质工程的目标。
Through a real project, the author introduces a 1 200 m^2 natural ventilation cooling towers and the construction of major projects order of the programme and take the quality assurance measures. The practical construction proves that the production level of the concrete achieves excellent, realizes the construction of the reaching standard units and the creation of the quality project.
出处
《山西建筑》
2008年第32期137-138,共2页
Shanxi Architecture
关键词
自然通风冷却塔
施工技术
环基模板
环梁
池壁