摘要
建设项目工程造价的管理与控制是一个动态的过程,它始终贯穿于项目全过程。从建设项目的决策、设计、招投标及签约、施工、结算和项目后评价六个阶段分别阐述了如何对工程造价进行全过程控制。
engineering cost management and control of construction project is a dynamic course. It always runs through the whole process of the project. The paper expounds how to control the whole process of engineering cost from such six aspects of construction project as the decision, design, bid invitation and contract signing, construction, settlement and evaluation after project.
出处
《天津职业院校联合学报》
2008年第5期19-22,共4页
Journal of Tianjin Vocational Institutes
关键词
建设项目
工程造价
管理与控制
construction project
engineering cost
management and control