国家游泳中心内部气枕安装用脚手架体系的选型及分析 被引量:5

Selection and Analysis of Scaffold System for Installing of National Aquatic Center Interior Air-inflated Cushion Membrane Structure
下载PDF
导出
摘要 根据国家游泳中心工程内部气枕安装的施工条件,提出了移动平台脚手架支撑体系,介绍了下部支承架体和上部移动平台的结构构成。通过对支承体系的整体建模并考虑结构的几何非线性,分析了结构整体稳定。数值分析和工程实践表明,该体系强度高,整体稳定性好。对施工场地面积较大,内部净空较大工程,该体系具有节约成本,加快施工进度的优点。 Mobile scaffold system was put forward according to the construction conditions of National Aquatic Center air-inflated cushion membrane structure. The configurations of its lower supporting system and upper platform were introduced in detail. Integral stability was analyzed by modeling the whole structure and taking into account geometric nonlinear. The result of numerical analysis and the practices of project showed that carrying capacity of scaffolding system was higher and integral stability was better. The mobile scaffold system is suitable for the project which clearance is higher. It can reduce the cost of construction and speed up the progress.
出处 《施工技术》 CAS 北大核心 2008年第10期100-102,共3页 Construction Technology
关键词 国家游泳中心 脚手架 移动平台 几何非线性 整体稳定 national aquatic center scaffold scaffold mobile geometric nonlinear integral stability
  • 相关文献

参考文献7

  • 1梁培新,郭正兴.扣件式钢管移动脚手架施工的关键技术[J].施工技术,2007,36(2):38-39. 被引量:3
  • 2中华人民共和国建设部.GB50017-2003钢结构设计规范[S].北京:中国计划出版社,2003.
  • 3BS EN 12811-1:2003 Temporary works equipment-patti: scaffoldsperformance requirements and general design[ S].
  • 4BS EN 12811-2:2004 Temporary works equipment-part2: information on material[ S].
  • 5BS EN 12811-3:2002 Temporary works equipment-part3: load test [S].
  • 6BS EN 12810-1:2003 Facade scaffolds made of prefabricated components -part1 : products specification[ S].
  • 7BS EN 12810-2:2003 Facade scaffolds made of prefabricated components -part2: particular methods of structural design[S].

二级参考文献1

  • 1中国建筑科学研究院.JGJ130-2001建筑施工扣件式钢管脚手架安全技术规范[S].北京:中国建筑工业出版社.2001.

共引文献286

同被引文献27

  • 1.GB50017-2003钢结构设计规范[S].北京:中国计划出版社,2003..
  • 2BS EN 12811-1 : 2003 Temporary works equipment-part 1: scaffolds-performance requirements and general design [ S ]. 2003.
  • 3BS EN 12811-2 : 2004 Temporary works equipment-part 2: information on material [ S ]. 2004.
  • 4BS EN 12811-3: 2002. Temporary works equipment-part 3: load test[ S]. 2002.
  • 5BS EN 12810-1 : 2003 Facade scaffolds made of prefabricated components -partl: products specification[ S]. 2003.
  • 6BS EN 12810-2:2003 Facade scaffolds made of prefabricated components -part 2 : particular methods of structural design [ S ]. 2003.
  • 7A,H.拉耶夫斯基.结构稳定计算原理[M].赵超燮,袁耀明译.北京:高等教育出版社,1966.
  • 8JGJ128-2000建筑施工门式钢管脚手架安全技术规范[S].北京:中国建筑工业出版社,2000.
  • 9中国建筑科学研究院.JGJ130-2001建筑施工扣件式钢管脚手架安全技术规范[S].北京:中国建筑工业出版社.2001.
  • 10秦敬伟,师永恒.移动式脚手架体系选型及结构分析[J].施工技术,2010,39(3):44-47. 被引量:5