新奥法隧道开挖围岩级别快速判定方法 被引量:1

Fast Grade Determination for Surrounding Rock Excavated with New Austrian Tunnelling Method
下载PDF
导出
摘要 隧道开挖对岩层的级别判定,历来都存在不确定性和多解性,文章通过在高速公路隧道施工断面上划分9个分区,对每个分区确定级别加权系数,9个分区的系数之和为1,再与图纸设计的围岩级别相加,取代数和,得出初期支护所需的级别,避免了盲目估算围岩级别而产生偏差的现象。 The judgment of surrounding rock grade is indeterminacy and multi-separation for a long time during the process of tunnel excavating.In this paper, construction section of expressway tunnel is devided into 9 branch zones and each branch zone has a grade weighting coefficient and the sum of these 9 branch coefficients is 1.Then adding the surrounding rock grade of the designing drawing with the coefficients, the grade of initial supporting demand is got .In this way, the deviation of surrounding rock grade estimation could be avoided.
出处 《现代交通技术》 2008年第5期59-62,共4页 Modern Transportation Technology
关键词 隧道工程 围岩 支护参数 加权系数 地质构造 tunnel engineering surrounding rock supporting parameter weighting coefficient geological structure
  • 相关文献

参考文献2

  • 1[2]静天文.公路隧道围岩分类与支护优化设计[M].北京:人民交通出版社.2006.
  • 2[3]李国峰.特殊地质公路隧道动态设计施工技术[M].北京:人民交通出版社.2005.

共引文献1

同被引文献10

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部