期刊文献+

某综合楼桩基质量事故原因与处理

CAUSES OF PILE FOUNDATION'S QUALITY INCIDENT OF A COMPREHENSIVE BUILDING AND THEIR TREATMENT MEASURES
下载PDF
导出
摘要 某综合楼投入使用后,由于桩基承载力不足,造成墙体及混凝土梁板出现裂缝。而桩基质量事故与设计、施工及建设单位等多方面因素有关。针对实际情况,采用桩基托换补强,截桩迫降法纠偏、浇筑新承台等措施进行处理,取得良好效果。 As soon as the operation of a comprehensive building started and due to the incapability of its pile foundation's bearing capacity,there were cracks occured in its wall bodies,concrete slabs and beams.There were many factors: such as poor design, poor construction and inadequate building units et al.had caused all these cracks.According to these cracks actual conditions,these were treatment measures namely;(1)strengthening method of pile foundation underpinning,(2)rectifying deviation method of cutback pile and (3)method of newly built foundation platform et al.all these measures are proved effective with good results
作者 袁庆华
出处 《建筑技术》 北大核心 1997年第9期614-615,共2页 Architecture Technology
关键词 灌注桩 裂缝 承载力 桩基 质量事故 处理方法 foundation bored pile,crack,bearing capacity,settlement
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部