期刊文献+

750kV输电线路工程混凝土灌注桩结构裂缝成因分析及预防措施

Causes Analysis on Structural Crack in Bored Concrete Pile in 750 kV Power Transmission Line Project and its Preventive Measures
下载PDF
导出
摘要 对塑性沉降裂缝、塑性收缩裂缝、温度应力裂缝、施工工艺质量引起的裂缝和原材料质量引起的裂缝的成因进行了分析,提出针对性的预防措施。并将这些措施运用到750 kV贺兰山—黄河输电线路工程中,和同类型的灌注桩相比,该工程完工后桩身和联梁表面平整光滑,完全没有裂缝。该预防措施取得了良好的效果。 The paper analyzes the causes of crack, which are induced by plastic settlement, plastic shrinkage, temperature stress, technology & quality of construction and raw material quality. Some preventive measures are proposed and used in 750 kV Helan Mountain-Yellow River transmission project. Comparing with the same type of bored concrete pile, the surface of the pile body and binding beam is smooth and entirely fi'ee of crack after project completion. The preventive measures have gained a good effect.
机构地区 宁夏电力设计院
出处 《陕西电力》 2008年第10期29-31,共3页 Shanxi Electric Power
关键词 混凝土灌注桩 裂缝 类型 成因 预防措施 bored concrete pile crack type cause preventive measure
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部