四川电力设计咨询有限责任公司(SEDC)于2007年5月签订了印度WPCPL4×135MW发电工程总承包合同,并于2007年5月12日在现场进行了开工仪式。为确保该工程竣工档案的完整、准确与系统,在工程开工初期,公司就制定了竣工文件的编号办法,并得到了业主的确认。目前,各种类别文件材料的形成、收集、整理都处于受控状态。
Sichuan Electric Power Design &Consulting Co. , Ltd. (SEDC) has signed contract wiht Indian WPCPL 4 × 135MW generates electricity project contract always in May 2007. And has started in May 12, 2007 in the scene of building site ceremony. For guarantee this project completion files complete , accurate with system. When at the beginning of project starts. Our company has established the rule of serial number of completion file. And have gotten the confirmation of owner. Now, various files form, collect and arranged to be in to get the state controled.