期刊文献+

黑启动的定性推理模型 被引量:2

Qualitative reasoning model for black-start
下载PDF
导出
摘要 采用定性进程理论设计了一个黑启动的定性推理模型,该模型主要用于表达制订黑启动方案的一般策略。模型考虑了各类火电单元机组的启动特性,以及黑启动过程中系统的主要限制条件。通过对黑启动过程的详细分析,定义了定性推理系统中相应的个体视图和进程。大停电事故后,系统不同初始状态将激活不同的个体视图和进程,并得到按时间轴排列的事件和史段。史段和事件直观地表示了黑启动方案中主要的操作步骤、步骤间的先后次序、所需时间的长短等。模型既可用于抽象的黑启动方案的推理及修正,也可以作为具体黑启动方案的解释工具。 Using qualitative process theory, a qualitative reasoning model for power system black-start was designed. The general strategies of black-start are well represented in this model, and the thermal units' start up characteristics and system constrains were considered carefully. By thoroughly studying the black-start processes, the individual views and processes of qualitative reasoning model were defined. According to the original states of system after blackout, different individual views and processes in the model are activated, and the episodes and events ranked by time are deduced. The episodes and events express intuitionally the main operations of black-start plan, their ranks and the time of these operations. The qualitative reasoning model can act as a revising tool for abstract black-start plan, and an explaining tool for detail black-start plan.
出处 《中国电力》 CSCD 北大核心 2008年第11期10-13,共4页 Electric Power
基金 国家自然科学基金资助项目(50307006)
关键词 大停电事故恢复 黑启动 定性推理 定性进程理论 restoration black-start qualitative reasoning qualitative process theory
  • 相关文献

参考文献5

  • 1LIN Chen-Chin, LIOU Kan-Lee, CHU Ron F, et ol. Generation capability dispatch for bulk power system restoration : a knowledge-based approach [J ]. IEEE Trans. on Power Systems, 1993, 8 ( 1 ) : 316-325.
  • 2周云海,闵勇,杨滨.黑启动及其决策支持系统[J].电力系统自动化,2001,25(15):43-46. 被引量:58
  • 3ANACIN J J. A frame work for power system restoration following a maj or power failure [ J ]. IEEE Trans. PWRS, 1995,10(3) : 1480-1485.
  • 4ADIBI M M, FINK L H. Power system restoration planning [J ]. IEEE Trans. PWRS, 1994, 9 ( 1 ) : 22-28.
  • 5陆汝钤.人工智能[M].北京:科学出版社,2000..

二级参考文献8

  • 1王永庆,人工智能原理与方法,1998年
  • 2Delfino B,IEEE Trans Power Systems,1996年,11卷,3期,1377页
  • 3李书涛,决策支持系统原理与技术,1996年
  • 4Fink L H,IEEE Trans Power Systems,1995年,10卷,2期,745页
  • 5Huang J A,IEEE Trans Power Systems,1995年,10卷,2期,869页
  • 6Lin C C,IEEE Trans Power Systems,1993年,8卷,1期,316页
  • 7Kearsley R,IEEE Trans Power Systems,1987年,2卷,2期,422页
  • 8江长明,闫贺群,许鹏.华北电网黑启动试验[J].电力系统自动化,2000,24(22):57-58. 被引量:22

共引文献67

同被引文献29

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部