PC斜拉桥的时变分析──确定性分析 被引量:2

Time-Dependet Analysis of PC Cable-Stayed Bridge-Certainty Analysis
下载PDF
导出
摘要 通过对现有各种理论的研究和比较,认为Trost-Basant提出的“按龄期调整的有效模量法”是适合于PC斜拉桥分阶段施工特点的收缩徐变计算理论。根据该理论推导了新的增量形式的时变方程式,通过编程运算,可以将结构在各个阶段有节点力和位移的增量在一次运算中求出。同时还选用了目前广泛采用的多种收缩徐变模式进行了比较计算,认为BP-KX模式较适合于PC斜拉桥的时变分析。并通过对运营13年后的红水河铁路斜拉桥的实桥测试,将试验数据与计算结果进行分析比较,进一步论证了所提出的理论和方法的可行性,同时还得出了几点有意义的结论。 The authors compare different existing theories and picked out the Age-Adjusted Effective Modulus Method presented by Trost-Bazant as one that fits in with the stage-bystage construction procedure of PC cable-stayed bridges. Following this theory, a new incremental time-dependent equation is derived which enables the calculation, through one programed computer operation, of the forces and displacements at all nodes of the structure under different construction stages. Moreover, the BP-KX Model is opted from among different kinds of shrinkage and creep models in current use to be fitting in better with the time-dependent analysis for PC cable-stayed bridge. By comparing the calculated results with site measurements obtained from the Hong Shui River Railway Bridge which has been in service for 13 years, the applica bility of the proposed theory and method is further verified. In addition, several meaningful conclusions are made.
出处 《中国铁道科学》 EI CAS CSCD 北大核心 1997年第4期33-41,共9页 China Railway Science
关键词 斜拉桥 时变 确定性分析 收缩徐变 预应力混凝土 PC cable-stayed bridge, Time-dependent, Certainty analysis, Shrinkage and creep,Age-Adjusted effective modulus method
  • 相关文献

参考文献8

  • 1潘家英.混凝土结构的徐变计算[J]土木工程学报,1983(04).
  • 2程庆国,金东灿,吴亮明,周祖里,莫拔颖,揭更荣.红水河铁路斜拉桥设计、施工和试验研究[J]土木工程学报,1982(02).
  • 3Zdeněk P. Ba?ant,Liisa Panula,Joong-Koo Kim,Yunping Xi. Improved prediction model for time-dependent deformations of concrete: Part 6—Simplified code-type formulation[J] 1992,Materials and Structures(4):219~223
  • 4Zdeněk P. Za?ant,Joong-Koo Kim. Improved prediction model for time-dependent deformations of concrete: Part 5 — Cyclic load and cyclic humidity[J] 1992,Materials and Structures(3):163~169
  • 5Zdeněk P. Ba?ant,Joong-Koo Kim. Improved prediction model for time-dependent deformations of concrete: Part 4—Temperature effects[J] 1992,Materials and Structures(2):84~94
  • 6Zdenek P. Ba?ant,Joong-Koo Kim. Improved prediction model for time-dependent deformations of concrete: Part 3-Creep at drying[J] 1992,Materials and Structures(1):21~28
  • 7Zdeněk P. Ba?ant,Joong-Koo Kim. Improved prediction model for time-dependent deformations of concrete: Part 2—Basic creep[J] 1991,Materials and Structures(6):409~421
  • 8Zdeněk P. Ba?ant,Joong-Koo Kim,Liisa Panula. Improved prediction model for time-dependent deformations of concrete: Part 1-Shrinkage[J] 1991,Materials and Structures(5):327~345

同被引文献4

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部