瓦屋山水电站大坝左岸泄洪洞混凝土缺陷处理 被引量:2

Treatment on concrete defect of discharge tunnel at left bank of dam for Wawushan Hydropower Station
下载PDF
导出
摘要 四川瓦屋山水电站大坝左岸无压泄洪洞断面尺寸、泄洪流速流量均较大。底板和直墙为高强抗冲耐磨硅粉混凝土,其缺陷处理技术要求较高和难度较大。其缺陷处理中采用了新型材料如丙乳硅粉水泥砂浆、丙乳硅粉胶泥、预缩硅粉水泥砂浆等,并严格施工工艺和质量控制,取得了良好效果。 The cross-section dimension, velocity and flow rate of the free-flow discharge tunnel at left bank of dam for Wawushan Hydropower Station in Sichuan Province are relatively larger. As the bottom slab and vertical walls of the tunnel are constructed with high anti-abrasion silica powder concrete, the concrete defects are treated with higher technical requirement under larger difficulty. In this case, the new construction materials such as acrylic-emulsion cement mortar, puddle mixed with silica powder, pre-reduction silica powder cement mortar etc. are applied to the treatment of the defects with strict construction technology and quality control, and then better concrete mending effect is obtained as well.
作者 李轶玉
出处 《水利水电技术》 CSCD 北大核心 2008年第11期11-14,共4页 Water Resources and Hydropower Engineering
关键词 瓦屋山水电站 泄洪洞 混凝土缺陷 处理 Wawushan Hydropower Station discharge tunnel concrete defect treatment
  • 相关文献

同被引文献13

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部