摘要
EAST托卡马克核聚变试验装置是中国科学院等离子体物理研究所承建的国家大科学工程,文中对该装置关键部件的装配方案、装配中心基准点的建立以及装配工艺过程进行了描述,该工艺方案保证了EAST主机装配的质量和操作安全。
EAST is a Chinese National Mega-project of Science and Engineer performed by ASIPP. This paper describes the scheme, the base center and the process of EAST device key parts assembly. This technology scheme is qualified and safe.
出处
《机械工程师》
2008年第11期130-131,共2页
Mechanical Engineer