摘要
抽水蓄能电站主要机电设备是电站的核心部件,直接关系到电站的运行效益和稳定性。经调研,并在国家发改委的支持下,宝泉抽水蓄能电站最终采用统一招标、引进技术的方式进行了主机设备国际招标采购。这种招标采购模式,有利于提高国内厂家的设计、制造水平和市场竞争力,亦可降低电站运营成本。
The main electrical and mechanical equipment of pumped storage power station is the core parts of the station, which is directly related to the operation benefits and stability of the station. Based on the investigation and researches and under the support of the State Development and Reform Commission of China, the international bidding purchase for the main machine equipment of the Baoquan Pumped Storage Power Station adopted the way of binding-together bidding and the imported technology. Such bidding purchase way is favorable to the enhancement of design and manufacturing level and the market competition force of home factories and also could reduce the operation costs of the station.
出处
《水力发电》
北大核心
2008年第10期8-11,共4页
Water Power
关键词
机电设备
招标方式
主机合同
宝泉抽水蓄能电站
electrical and mechanical equipment
bidding way, contract of main machine
Baoquan Pumped Storage Power Station