摘要
宝泉抽水蓄能电站工程采用"小业主、大临理"的工程建设管理模式。施工测量采取明确职责、分级管理模式,与工程量有关的现场测量采用三方联合测量方式。经过几年实践表明,这种管理模式是可行的,对减少工程造价和确保工程质量起到了重要作用。
Baoquan Pumped Storage Plant used the Management Mode of "employer control,engineer liability". The construction survey adopted the Grading Management Mode and specify the duty,for the more,Three combined group Measurement is adopted In the course of field measurement, practice has showed that this mode is a feasible approach and play a important role in lessening projects construction costs and ensuring engineering quality.
出处
《水力发电》
北大核心
2008年第10期42-44,共3页
Water Power
关键词
施工测量
控制网
测量新技术
工程量计量
宝泉抽水蓄能电站
construction survey
control network
new measurement teehnology
engineering quantity calculate
Baoquan Pumped Storage Power Station