北京HI-13串列加速器一直保持良好的运行状态。近几年,根据设备的运行状态和实验室的发展需求,陆续完成了注入器升级改造、能量重新刻度、分析磁铁电源改造、主真空系统改造等技术改造工作。新建两条专用实验束流线,正在进行辐射防护系统的改造。本文介绍串列加速器的运行情况,重点阐述技术改造的完成或进展情况。
Beijing HI-13 tandem accelerator was in good operation in the past years. Considering the operation status of the equipment and the development demands of the laboratory, several upgrading projects were completed which include the upgrade of the injector system, energy re-calibration and improvements of the main vacuum system and the power supply of analyzing magnet. Moreover, a new special beam line was established and another one is under construction. The improvement of the radiation protection system is also in process. In addition to introducing the operation of the tandem accelerator, this paper describes the improvements of HI-13 tandem accelerator in our laboratory.
出处
《原子能科学技术》
EI
CAS
CSCD
北大核心
2008年第B09期251-253,共3页
Atomic Energy Science and Technology
关键词
注入器升级改造
能量刻度
辐射防护
束流管道
真空
injector upgrading
energy calibration
radiation protection
beam line
vacuum