摘要
大中型水利电力工程的主要施工设备对工程建设至关重要,而所要选择的主要大型施工设备的类型和规格往往是由工程本身的特点和所处的地理环境所决定的。在分析黄河龙口水利枢纽工程的概况以及主要施工机械各种备选设备特点的基础上,针对原有工程设备资源状况,提出了多种施工设备选择方案。通过对方案的逐一分析,确定了具体实施方案并提出了相应的风险防范措施。为同类型工程施工提供了参考案例。
The main constructional equipments of large and medium-sized hydro-electric engineering projects play an important role in the project construction, and types and specifications of the main large constructional equipments are usually determined by characteristics of the project itself and its geographical environment. This paper analyzes the generalizations of Longkou water control project on Yellow River and the characteristics of various spare equipments of main construction machinery ,proposes several selection strategies of constructional equipments by taking resources status of the original constructional equipments into consideration ,and then based on analyzing the selection strategies one by one ,makes concrete execution plans and provides hazard countermeasures accordingly. It offers comparable cases for the same types of project constructions.
出处
《电力学报》
2008年第5期402-404,共3页
Journal of Electric Power
关键词
水利枢纽工程
施工设备
选择
方案
water control project
constructional equipment
selection
strategy