宁夏大学活动中心观众厅钢管桁架屋盖施工时,采用钢管临时支撑系统支撑,整个观众厅钢管桁架屋盖结构在施工阶段的受力情况与最终结构受力情况不同。通过对该屋盖结构受力体系卸载过程的施工技术进行介绍,为今后此类工程施工积累了资料。
The temporary support system is used for the construction of the activity center of Ningxia University on its roof of the specter hall. The initial situation of stress on steel pipe truss structure for specter hall is different from its final situation during construction progress. The thesis introduces the construction technology of the roof structure during the unloading progress, and it can be the reference of other construction activities.