结合工作实践,针对磨煤机基础施工现场影响因素较多的特点,对测量放线、钢筋工程及其固定架安装、预埋螺栓套筒安装、混凝土工程等磨煤机基础施工要点作了论述,以使其施工满足规范要求。
Combined with practice, according to the feature that there are many factors influencing the basis construction by coal pulverizer, it discusses the key points in coal pulverizer basis construction such as survey and setting out, steel bar project and its fixing frame installation, pre-buried bolt sleeves installation, and concrete project, so that the construction can meet the requirements of standard.
出处
《山西建筑》
2008年第33期132-133,共2页
Shanxi Architecture
关键词
磨煤机基础
预埋螺栓套筒安装
混凝土工程
施工
coal pulverizer basis, pre-buried bolt sleeves installation, concrete project, construction