摘要
进行调压室涌波叠加计算是新《水电站调压室设计规范》提出的要求。本文介绍了调压室涌波叠加工况的计算方法,并给出了大桥水电站差动式调压室鳖加工况涌波计算实例。
According to newly publicated 'Design Standard For Surge Chamber of Hydropower Station',computation for superimposed surge must be carried out. Computation method of superimposed surge in surge chamber are presented. Computation for superimposed surge in differential surge chamber at Daqiao hydropower station is given.
出处
《四川水力发电》
1997年第4期88-90,共3页
Sichuan Hydropower
关键词
调压室
涌波
叠加工况
水电站
水力学
surge chamber,surge.superimposed condition,most unfavourable time