通过对漫湾电站左双泄底孔明渠底板和边墙破坏原因分析,提出运行的防范措施。冲坑采用硅粉混凝土修复技术.经1997年汛期考验,效果明显。
This paper proposes the protective measures to ensure operaion after making damagecause analysis of both the hottom plate and the side walls ofthe left double discharge bottom outletopen channel.Silica powder concrete technigue was used to repair the plunge pool, which hasproved successful after being tested during the flood season in 1997.
出处
《云南水力发电》
1997年第4期72-74,共3页
Yunnan Water Power
关键词
左泄底孔
硅粉混凝土
水电站
明渠
破坏
修复
Manwan Hydropower Plant left discharge bottom outlet silica powder concrtete